Actions: excavation support works - spry concrete and soil nails (IBO 32/15).
Contractor: „Inos -1” LTD
Period: 04.2008 Status: completed
view
Actions: anchor stabilization works (IBO R32/22).
Contractor: "Transstroy Rousse" Inc.
Period: 03.2008 Status: completed
view
Actions: excavation support works - spy concrete and soil nails (IBO 32/15).
Contractor: Aladin Building
Period: 02.2008Status: completed
view
Actions: anchor stabilization works (IBO R32/18,5).
Contractor: "Hydroinject" LTD
Period: 02.2008 Status: completed
view
Actions: stopping leaks with the use of fast reaction PU-resins.
Period: 02.2008 Статус: completed
Status: completed
view